- Details
-
ROPOS 2025 Schedule
| Dates |
Ship |
Work Site |
Client |
Status* |
| May 3 to June 13 |
R/V Isabu |
Indian Ocean |
KIOST |
Completed |
| August 14 to September 9 |
R/V Isabu |
Pacific Ocean |
KIOST |
Completed |
ROPOS 2026 Schedule
| Dates |
Ship |
Work Site |
Client |
Status* |
| April 20 to (completion date to be determined) |
R/V Isabu |
Indian Ocean |
KIOST |
Proposed/Tentative |
| Late August (dates to be determined) |
R/V Isabu |
Pacific Ocean |
KIOST |
Proposed/Tentative |
(*) There are three possible status:
- Proposed/Tentative
- A user has expressed intentions of using ROPOS but has not confirmed. The mission dates may change or the mission may be cancelled.
- Confirmed
- The mission is confirmed and the ROPOS vehicle cannot be scheduled by other users within those dates.
- Completed
- The mission has been completed.