ROPOS 2023 Schedule

Dates Ship Work Site Client Status*
March 18th to May 10th R/V Isabu Indian Ocean KIOST Completed
May 26th to June 12th CCGS John P. Tully Pacific Ocean DFO Confirmed
August 6th to September 8th R/V Isabu Pacific Ocean KIOST Proposed/Tentative
September 29th to November 20th R/V Sonne Indian Ocean BGR Confirmed

(*) There are three possible status:

Proposed/Tentative
A user has expressed intentions of using ROPOS but has not confirmed. The mission dates may change or the mission may be cancelled.
Confirmed
The mission is confirmed and the ROPOS vehicle cannot be scheduled by other users within those dates.
Completed
The mission has been completed.